For Client confidentiality – No preplot or postplot survey data is stored on our servers.
For technical support, or to report bugs:
admin@candooka.world
aledmorgan@gmail.com
+60 123 825 450 (WhatsApp, SMS, voice)
OSPO v2.2
ONLINE
Survey Lines
3D SURVEY
Z: 10E: -- N: -- | --, -- | --
Predicted Tides
TPXO9 — 15-constituent global ocean tide model (M2, S2, N2, K2, K1, O1, P1, Q1, M4, MS4, MN4, Mf, Mm, Ssa, S1) with 1/6° atlas resolution. Nodal/astronomical corrections applied.
📍 PREDICTION LOCATION
📅 PREDICTION DATE RANGE
WORKING ON IT
Fetching ocean model tide data...
Spring TidePeak HeightNeap Tide
High:2.50m
Average:1.25m
Low:0.10m
Geodesy & Coordinate Systems
Configure projection and ellipsoid parameters for grid-to-geographic conversions.
Active UTM Zone:31 N
Central Meridian:3° E
False Easting:500,000 m
False Northing:0 m
Coordinate Conversion
Batch Conversion
Paste multiple coordinates (one per line). Auto-detects Lat/Lon or UTM format.
Measuring Tools
Click on the map to measure distances, bearings, and areas. Press Escape or double-click to finish.
Choose Start Line & Direction
Select which survey line to begin from and the acquisition direction.
Set Start Location
Select coordinates where the survey vessel starts transit to optimize the line sequence.
Current: First line start (Auto)
Or Start From a Specific Line
Post-Plot QC — Attributes vs SP
Load acquired sequence files (P1/90, P1/11, raw P2/94 or raw P2/11) to extract per-shotpoint attributes and graph them against SP. P2/94 adds streamer depths, pitch/roll/heave, gyro/network observations and GPS heights; P2/11 adds gun depths/pressures/timing, MRU, gyros and GPS heights (auto-grouped by node). Files are processed locally — nothing is uploaded.
QC limits (optional, per survey specs):Out-of-spec shots flagged red on graphs
No post-plot files loaded.
Fold of Coverage — CMP Bin Maps
Builds CMP fold maps from P1 files containing shot (S) and receiver group (R) records. Each shot–channel midpoint is binned on the grid below, split into offset quarters of the cable (nears / near-mids / far-mids / fars / alls). Fold accumulates across every file you add — load the next sequence to build up coverage. Files are processed locally.
Bin grid:head
% → tail
% of native width
N
% NM
% FM
% F
%
Origin/orientation left blank are taken from the first file (first midpoint / line azimuth). The grid locks after the first file — Reset Fold to change it.
No fold data — add a P1 file with receiver (R) records.
Map Layers
Toggle map layer visibility overlays.
Base Map
Overlay Layers
User Data Layers
25%
Hazards & Obstructions
Line Manager
Review preplot lines below. Mark acquired or partial lines to exclude them from routing. Add infill lines if needed.
Right-click a line for more options
Priority (1–100): sets the acquisition order — lower numbers are acquired first, higher numbers last. 50 = Neutral (default). E.g. a line set to 1 is shot before all others; a line set to 100 is left until the end. Within the same priority the planner still optimises transit time.
Infill Lines
Add infill lines between existing lines to fill coverage gaps.
&
Execution Priority
Select the pathfinding solver optimization strategy.
Survey Planning Report
--
Survey Configuration
Survey Type:-
Vessel Speed:-
Minimum Turn Radius:-
Run-in / Run-out:-
Line Spacing:-
Swath Width:-
Line Progression:-
Fold of Coverage:-
Coordinate Datum:WGS 84
Projection:-
Survey Area Extents
North Boundary:-
South Boundary:-
East Boundary:-
West Boundary:-
Area Centroid:-
Bounding Box Area:-
Acquisition Line Metrics
Total Survey Lines:-
Line Bearing:-
Shortest Line:-
Longest Line:-
Average Line Length:-
Full Fold Distance:-
Full Fold Area:-
Run In/Out:-
Total (incl. runs):-
Acquired vs Planned Split
Acquired
Prime Acquired (full fold):-
Prime Acquired (inc. run-outs):-
Infill Acquired (full fold):-
Infill Acquired (inc. run-outs):-
Planned (Remaining)
Prime Planned (full fold):-
Prime Planned (inc. run-outs):-
Infill Planned (full fold):-
Infill Planned (inc. run-outs):-
Route & Line Changes
Total Route Distance:-
Online Distance:-
Line Change Distance:-
Number of Line Changes:-
Avg Line Change Distance:-
Duration Estimates
Online Acquisition Time:-
Line Change Time:-
Bare Bones Duration (Online + Line Change):-
Estimated Completion (Bare Bones):-
Adjustments
Technical Downtime:-
Standby Time:-
Time Adjustments:-
Infill %:-
Mob/Demob Days:-
Additional Planned Days:-
Additional Unplanned Days:-
Full Project Duration
Total Projected Duration:-
Estimated Completion (Full):-
Cost Estimation
Vessel Day Rate:-
Estimated Total Cost:-
Efficiency Analysis
Productive Ratio:-
Line Change Overhead:-
Source Density:-
Hazards & Exclusions
Exclusion Zones:-
Skipped Distance:-
Lines Affected:-
Line Schedule
PDF opens in a new tab — use your browser's Print/Save as PDF
Candooka Licensing Portal
Apply for a 1-Month Free Trial License for your organization. Please enter your name, email, and phone below to activate.
Select a License Plan with full features, real-time sync, and premium marine survey route planning.